Well here is the latest on the house. They are working on the finishing touches. Hopefully it will be done soon.

The Carpet pad in the Den. Carpet should be done tomorrow.

The Toilets are in. This is the Master Bath.

More of the Master.

The Tub will be here.

The Master Shower.

Moving on to other parts of the house.

The Laundry Room cabinets and sink.

Close up of the sink and faucet.

The Guest Bath.

The shower/tub in the guest bath. All of the shelves in the showers are pieces of granite from the countertops. Nice touch by the tile installers.

The Bathroom in the Bedroom. Just waiting for the basin to be put in.

The sink in the garage with the water heater. It’s a 75 gallon waterheater. Finally no running out of hot water.

The rock on the fireplace was going in today as well.

This is the front door color, not sure about it yet, but it’s growing on me.

Now for the kitchen. The molding was put on the top of the cabinets.

June 2010

May 31st, 2010

It’s been a while since I last updated everyone. Lots has happened in the past month. The stucco is up the tile is on the roof. The paint is on the walls, the tile is on the floor, the lighting is in cabinets and countertops are almost done.

Front of the house.

Lighting in the garage.

The master bedroom with the ceiling fan.

Looking from the den towards the foyer.

From the living room into the foyer.

Dining room chandelier.

Bedroom Closet.

Den Closet.

Pantry.

Master closet, Shoes and shelves.

Now the cabinets and countertops.

Kitchen.

The Island.

Kitchen Sink

The Laundry Room.

Master Bathroom.

More of the Master Bathroom.

May 5, 2010

May 6th, 2010

May 5 and things are coming along. The drywall is in, next up is texture and paint.

These are the garage. Above is the hallway into the house from the Garage.

The kitchen. The range is on the wall.

The pantry.

Looking down the hallway from the kitchen to the bedrooms.

Looking from the living room into the foyer.

From the den to the foyer.

The Master Bedroom out into the hallway and den.

Looking out of the Master Bedroom to the backyard.

Master Bathroom.

Dining room windows from the back patio.

The back patio from the Master Bedroom side.

April 29, 2010

May 1st, 2010

Its been about a week and things are really moving along. The wiring, plumbing and gas, heating and A/C ducts were finished. The doors were put on and all the windows are in place. The Block windows in the Master Bath were put in. The Fireplace was also installed. After all that the insulation was placed and now the sheetrocking is starting.

The Breaker box in the garage.  The little blue boxes in the top left corner of the picture are for tv and electricity. What every garage needs.

This is going to be a sink in the garage.

The Fireplace in the Living Room.

Wiring above the Fireplace for the TV and Surround sound.

Wall between the Master Bedroom and the Living Room.

More now from the outside of the house.

This is taken from the property line in the back. The Fireplace looks out. The house just needs a little more paper wrapping and then the wire will be put on and it will be ready for stucco.

The Back patio with the door to the living room.

The Master side of the backyard.

Looking at the Master Bath. The Glass blocks are over the Tub.

The Cabinets have been ordered. They will be Cherry wood with Natural Finish on them. The Tile and Carpet was picked out today. Next big decisions will be the Countertops, Paint-for the doors and trim as well-, and lighting.

This is the tile.

The Carpet.

Where the tile and carpet meet in the foyer and living/dining areas will be a border. Its not picked yet but this is the favorite so far.

April 22

April 22nd, 2010

The framing is  almost done and they are  starting to work on the interior.

Here is the view from the front door.

With the walls up it was time for the windows to go in and paper on the outside.

Looking at the front door, it still needs stain.

The back patio with the overhang

Looking at the back of the house, windows in place

The Back of the House, the fireplace will be between the two windows.

More of the outside of the house, the back, looking at the master bedroom.

Moving to the inside of the house.

This is  the master Bathroom, glass blocks will be the windows over the tub.

Looking out the Master Bedroom to the backyard.

Looking from the living room into the foyer and front door.

From  the Living room into the kitchen

More House April 9, 2010

April 9th, 2010

Ok, here are more of the house, now that the house is almost all framed. To see the older pictures click the March 2010 link on the right of the page.

The first picture is a similar house to mine. The differences are mine has a higher roof line along the front and the den on the right and the garage is squared out.

Here are some more pictures of the house. This is the garage  with the wall built up to hide the roof line.

More of the exterior of the house. First the front then the back

The next pictures are inside the garage.

Building the House

March 29th, 2010

The house so far.

These are the plans. I changed some of the original plans. Now the house is flipped the other way,  the garage is on the left and the master is on the right. I had the builder square the garage so it is now 33′9″ deep and 27′ wide, added a closet and doors to the den in front of the master suite, and my favorite, took the fireplace out of the corner of the room, put it in the middle of the wall and made it a two way that can be seen from the backyard as well.

The next four pictures are of the lot being cleared.  All of the pictures are from the road looking back. The lot is approximately 0.35 acres.

The lot became an official job site, they brought in the port-a-john.

Prepping the lot, getting ready to pour the footers.

Plumbing and Footers going in.

Finally the lot was prepped and the pad was poured. The House is being built on a slab with all the plumbing coming up through the floor.

The garage.

After the pad was poured and set the framing started. They started on the house and poured the driveway as well.

Once the framing started it went up pretty quick.

Looking out the front door towards the garage.

Across the house from the garage.

Looking up the Driveway to the front.

The framing went up pretty quick. As of March 30, just waiting on the trusses to get here now. They should be going up in the next day or so.

Heres a few more pictures of the house since then.

This is the back of the house, from the corner of  the lot.

The Front door with the beam for the porch and  columns  in place.

March 31 they started with the trusses. I thought they would be  done with them on April  1, but the weather turned bad. We had  rain and snow today with pretty high winds. Here’s what they have done so far.

Looking at the front of the house with work over the Master suite.

And the Garage.

April 7 and they are still working on the roof. The weather hasn’t been cooperating the last few days, high winds kept them off the roof.

The house from the front.

Looking into the foyer from the living room and out the front door.

The back patio. This will be  a covered patio.

The roof finally going up. This is looking into the extra bedrooms on the west side of the house from the dining room.

Inside the garage.

More of the garage

This is the east side of the house. Looking in the den.